Achievements

EPC of luffing cranes

The terminal’s roof structure is made up of 36,964 shell cassettes in different shapes and sizes. The KIA T2 project will be one of the most environmentally conscious and advanced airports in the world

TANAP project; The first phase of TANAP stretches 1,334km from the Turkish-Georgian border to Eskishehir Province. It is being constructed in three LOTS. The pipeline on this stretch measure 56in in diameter, whereas the remaining stretches feature 48in diameter pipes.

The Lahore-Islamabad Motorway (M2) underwent major renovation to provide better travel and transit facilities for the commuters. The scope of work included a complete overlay (carpeting) for 337 km length, a modernization of motorway facilities & equipment, repair and rehabilitation to enhance motorway life.

The scope of works includes loosening, excavation, loading, transportation, dumping and leveling of overburden and other necessary surface facilities within the confines of Quarry.

The scope of works includes loosening, excavation, loading, transportation, dumping and leveling of overburden and other necessary surface facilities within the confines of Quarry.

The scope of works includes loosening, excavation, loading, transportation, dumping and leveling of overburden and other necessary surface facilities within the confines of Quarry.

Scope of the work;All necessary mine machinery operation activities such as preparation of all planning and engineering documents, exploration, dewatering, stripping (overburden and interburden removal about 7.500.000 m3/year) for extraction of about 5.500.000 ton/year design coal. Extraction, preparation, transportation and delivery 800.000 ton/year 0-60 mm size required quality limestone. Operation of coal stock pile (capacity 450.000 ton) in the power plant area.

Blue City Project – Al Madina A’ Zarqa (Blue City) Phase 1 was intended to be the largest touristic real-estate residential developments in the Middle East, located along the Al-Sawadi coastal region in Muscat, in the Sultanate of Oman. The Blue City project was primarily a residential and tourism development with leisure and retail elements in Muscat Al-Sawadi Region in Oman.
GES under contract with EPTSC is to monitoring and controlling more than 3000 genset service operation to achieve the required network KPIs and assure to get the highest quality services to the costumer PMCL and maintain resources efficiently and effectively. And close coordination with the client concerned departments especially official communication with client PMCL regarding contractual matters for smooth business relationship

The project is largest underground network of pipes 2,820 kilo meters. It consists of more than 1,300 wells, most more than 500 m deep, and supplies 6,500,000 m3 of fresh water per day to the cities of Tripoli, Benghazi, Sirte and elsewhere. This project also described it as the “Eighth Wonder of the World”. Numerous engineering companies from around the world have participated in this GMRA/ANC project. With honor, I performed my duties in machinery workshop at GMRA/ANC Sirte section where Mr. Khaldoon Kemal Kasim was the section project manager.

Turkey’s Bayinder construction company awarded a US$850 million contract for the construction of a new six-lane 154 kilometers long highway M1 motorway from Islamabad to Peshawar. Design work was carried out by the UK’s Mott MacDonald and the local Engineering Consultants. M-1 motorway was started in 1993. The Islamabad–Peshawar M-1 Motorway is connecting Peshawar to Islamabad. A plan was made to connect the existing M-2 Motorway with the Torkham Afghanistan border via M1 motorway.
M1 Peshawar motorway crosses three 3 major river bridges (Haro, Indus and Kabul rivers) and there are 17 flyovers, 27 small bridges, 12 interchanges, 3 Road over rail bridges, 137 underpasses and 571 culverts, 10 service areas along the M1 route.

Adamjee Diesel Engineering Pakistan (Pvt) Limited, a part of one of the largest industrial business house in Pakistan known as Adamjee Group, specializes in providing Diesel Generators sales and aftersales services and was one of the leading supplier of diesel generating sets to industrial, Commercial and residential sector throughout Pakistan. The company has been in business since 1962 with head office in Karachi and branches in Lahore and Islamabad. Adamjee diesel engineering is the authorized sole dealer for F.G. Wilson U.K. and IVCEO aifo (a company of FIAT Group) ITALY in Pakistan. Provided sales, service & spares as well as service agreements for generating sets ranging from 5 to 2000 KVA, manufactured incorporating engine from leading manufactures such as IVECO, PERKINS, LISTER-PETTER and LOMBARDIN diesel engine.

The scope of works included engineering, procurement, construction, installation, commissioning of a complete natural gas back-up system and all associated civil and structural works to improve the liability of gas supply to the major gas consumers and star-up of 36″ high pressure natural gas pipeline and various Pressure Reduction & Metering Stations and also modification, up-gradation and expansion of the existing Pressure Reduction & Metering Stations.

Our extensive global network ensures that we can source and supply a broad range of critical components for your cement plant machinery—ensuring smooth, efficient operations. We specialize in delivering high-performance parts at competitive prices, backed by global partnerships. Our offerings include:

Key Spare Parts for Cement Machinery:

• Gearboxes and drives

• Crushers & grinding equipment

• Motors, bearings, and hydraulic systems

• Filters, lubricants, and wear-resistant parts (liners, castings)

• Kiln rotary systems (seals, rollers)

• Electrical and automation components (motors, MCCB, sensors, valves)

• Conveyor systems (belts, rollers)

• Excavator & Wheel Loader spares and services

• Dust collection & environmental control systems

• Packing and loading equipment